Egyptian stone. Personal attention.
We connect international buyers with Egyptian stone, from the first material conversation to a clearly defined export order.
Browse materials
Good supply begins with a shared understanding.
A material name is only part of a stone order. The finish, the dimensions, the acceptable variation, and the way it is packed all matter. We help bring those decisions into one clear conversation.
Close to the material
Based in Egypt, our work connects material sourcing, cutting, finishing, and export preparation for international buyers.
Focused on your order
We work with importers, distributors, contractors, and project teams. Each needs a different level of detail, and a clear basis for approval.


The small details become the finished space.
A visible edge. The direction of a vein. The way two pieces meet. These decisions deserve attention before production begins, while there is still time to ask questions and refine the brief.
For custom work, share dimensioned drawings and identify the faces and edges that will remain visible. Reference images help explain the intended result.
How an order takes shape.
Four conversations connect the initial idea to production and export preparation. Explore what matters at each point.

First, understand what you are building.
We begin with the application, the material direction, and the scope. Early questions make the quotation more useful to the people buying, fabricating, and installing the stone.
- Material, dimensions, finish, and quantity
- Destination and the programme you are working toward
- Drawings, references, and decisions still open

Give everyone the same reference.
Samples and material information help the team agree what is acceptable. Natural variation should be part of the discussion from the start.
- Colour range and surface finish
- Thickness, edges, and visible faces
- Application requirements and requested test information

Keep the specification close to the work.
Cutting, surface finishing, and edge processing follow the confirmed scope. Inspection should refer back to the dimensions, finish, and selection agreed for the order.
- Approved drawings and piece references
- Agreed dimensions and tolerances
- Inspection points and any changes requiring approval

Think beyond the factory gate.
Packing and loading need to reflect the material, the journey, and the way the order will be handled on arrival. Shipping responsibilities belong in the agreement.
- Crate identification and packing requirements
- Loading plan and shipment documentation
- Agreed delivery terms and destination responsibilities
Different buyers. Different priorities.
We adapt the conversation to how you buy and use stone.
Your business
What matters
Where we start
Importers & distributors
What mattersA clear product range, commercial specification, and repeat-order expectations.
Where we startYour target market, preferred materials, supply formats, and order mix.
Fabricators & stone yards
What mattersMaterial selection that works with your own cutting and finishing plans.
Where we startSlab requirements, thicknesses, surface condition, and intended use.
Contractors & developers
What mattersA defined scope that can be checked against drawings and a project programme.
Where we startThe bill of quantities, dimensions, delivery sequence, and approval process.
Architects & design teams
What mattersThe right material character, supported by practical specification decisions.
Where we startApplication, visual references, sample requirements, and performance criteria.
A clearer working relationship.
The practical questions that help a first conversation become a well-defined order.
Do you work with buyers outside Egypt?
Yes. R&Y focuses on international B2B supply. Include your country and destination port or delivery location in the inquiry so the team can discuss the shipping scope and responsibilities.
Can we involve our architect or technical team?
Yes. Shared drawings, reference samples, and written acceptance criteria help everyone work from the same specification. Include any technical questions or approval requirements with your request.
What happens if the specification changes?
Raise the change as early as possible. A revised size, finish, quantity, or delivery requirement may affect production and pricing. Confirm the revised scope with the team before it becomes part of the order.
Can you confirm certificates or project-specific requirements?
List the documents, tests, or standards your project requires in the initial brief. Availability and suitability need to be checked for the selected material and order. Request confirmation before specifying or purchasing.
Let’s make the next conversation useful.
Tell us what you are sourcing, where it needs to go, and which decisions you need help making.
Start with what you have
- Your company and project location
- A material shortlist or reference image
- Approximate quantities and intended application
- Drawings and your target programme
You do not need a finished specification to begin.
